Joint Use Management (Pole Attachments)

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Pole Attachments

Utility Pole with Pole AttachmentsGarland Power & Light (GP&L) is required by the Communications Act of 1934, as amended, (47 U.S.C. 224) , the Telecommunications Act of 1996, and the Local Government Code: Chapter 283 to provide certain communications service providers non-discriminatory access to its poles for the sole purpose of attaching facilities used to deliver cable television and/or telecommunications services. 
GP&L must protect its assets while balancing the risks of allowing communications attachments on its poles. The goal of Joint Use Management is to provide consistency so that all parties are held accountable for actions that might negatively impact the safety and reliability of our electric distribution system, are treated fairly and equitably, and are assigned appropriate costs for make ready. 

It is GP&L’s practice to install poles of sufficient height to allow future installation of transformers and other electrical equipment on its poles, as needed to support GP&L’s core business of delivering electrical service. Therefore, GP&L design standards only allow for the attachment of communication facilities to the extent GP&L has sufficient capacity to install transformers and other electrical equipment on its poles. Because such space may not be needed for several years as part of Distribution Operations planning, it is GP&L’s practice to allow interim use of the pole in the “Communication Zone” for communication attachments. 

See GP&L’s Specifications for Electric Service (Blue Book) for information related to delivery of electric service. Section 5.26 and 5.27 are topics related to Joint Use Management. 

 

Permit Application and Submittal 

To begin the Permit Application (PA) process, submit a completed PA Form and map of the route to PermitApplication@trcsolutions.com.

 

Key Contacts

Distribution Engineering Manager
Dick McFall
Garland Power & Light
1755 Gasoline Alley
Garland, TX 75040
972- 205-2967
PoleAttachment@gpltexas.org

 

Hillary Hutchason
Associate Project Manager
TRC Solutions, Inc.
700 Highlander Blvd., Suite 210
Arlington, TX 76015
817-825-0000

 


Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download Windows Media Player Download Word Viewer Download Excel Viewer Download PowerPoint Viewer